Image Credit: Bethesda
Forgot password
Enter the email address you used when you joined and we'll send you instructions to reset your password.
If you used Apple or Google to create your account, this process will create a password for your existing account.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Reset password instructions sent. If you have an account with us, you will receive an email within a few minutes.
Something went wrong. Try again or contact support if the problem persists.

NASA Shows Off Moon Mining Robot

This article is over 11 years old and may contain outdated information
image

NASA’s new lunar rover is a huge departure from previous robot designs.

NASA’s newest robot prototype won’t be carrying around any delicate claws, lasers, or microscopes. No spectrometers or sample analysis devices. Instead, it’ll drive five times faster than Mars Curiosity and carry a pair of big, robust barrel excavators. The robot is called RASSOR, pronounced “razor,” for Regolith Advanced Surface Systems Robot. RASSOR’s goal, though, is possibly more interesting than its design. RASSOR is intended to be a moon miner, gathering materials using its excavators to drop lunar soil into a processing plant – that plant would turn water and ice in the soils into rocket fuel and breathing air for astronauts. Currently the most expensive part of space travel is launching the water and fuel into space, since 90% of the rocket’s mass is made of propellant. If you can make that propellant on the lunar surface, you’re a big step closer to sustainable, cheap space travel. “This has been kind of the dream, the mission they gear this around,” said A.J. Nick, an engineer on the RASSOR team.

The concept mission for RASSOR is a 2,000 pound payload delivered to the moon, of which only about 100 pounds would be RASSOR itself – the rest is an industrial fixture for the lunar surface,a processor for making the lunar soil into air, water, and propellant. RASSOR’s biggest hurdle is the sheer amount of time one little robot will have to work to generate enough resources – 16 hours a day for five years. “Right now, we just want to make sure nothing in our design precludes it from doing that,” said Jason Schuler, another RASSOR engineer. NASA’s calling RASSOR “a blue collar robot” – a robot designed for heavy industry in outer space.

The team is already working on RASSOR 2, which will likely be built in 2014. RASSOR 2 is intended to resemble a launch ready robot, but the engineers have a major hurdle to jump before then: wheels or treads? Recent tests have revealed that pebbles can slip into the current design and clog the gears, making the tracks slip off. The engineers have tried the rover on a variety of surfaces, but nothing can quite compare to what the lunar surface will be like. “You can’t take for granted that it’s going to work like it does on grass or concrete or even on sand,” said Schuler. To this end, the engineers are constructing a 25-foot-square area of faux lunar surface before continuing testing.

Source & Image: NASA

Recommended Videos

The Escapist is supported by our audience. When you purchase through links on our site, we may earn a small affiliate commission. Learn more about our Affiliate Policy